Main masthead image area

Himalaya Estate

Project Gully Erosion Repairs
Location Himalaya Estate, Tabletop, NSW
Client Albury City Council

Originally these roadside drains had scoured so severely that they presented with gully erosion almost 3m deep and 2m wide. The gullies were backfilled/compacted and alternate surface drains were excavated offset a couple of meters and protected with Landlok TRM's.

Himalaya

Area to display medium-sized image